National Repository of Grey Literature 4 records found  Search took 0.00 seconds. 
Mapinng and improving logistic flow in the firm ZEBR.
Kmeť, Lenka ; Vyroubal, Petr (referee) ; Špinka, Jiří (advisor)
The aim of the project is to chart the course of logistics and information flows of the selected company, to eveluate the entire process and to find improvements. In the first part there is mentioned an introduction into methods of lean manufacturing, value stream mapping and throughput time calculations. In the next section the flow of values is mapped and the map of current state is created. Futhermore, the throughput time of selected parts is computed and the mounting diagram of measured products is assembled. On to these materials are founded the sources of wasting and solutions are suggested. Afterwards on the basis of the obtained data are given solutions eveulated in terms of economic indicators.
Part Production Process Videoanalysis
Svobodová, Veronika ; Hromková, Ivana (referee) ; Knoflíček, Radek (advisor)
The bachelor thesis is describing mainly elimination of wasting time and with that also financial means on a welding line of high pressure tanks Common Rail in the company Bosh Diesel s. r. o. With detailed way is described procedure analysis of contemporary status and subsequent analysis, which is enable to search possibilities and potentials to increase productivity of work on productive line. With an application of tools ViCTA, we successfully found the searching potential in lost time in welding industrial robot’s line. Then was suggested the optimal solution, which comply the conditions of achieving minimal costs for current unlimited way of production technology on the welding line.
Mapinng and improving logistic flow in the firm ZEBR.
Kmeť, Lenka ; Vyroubal, Petr (referee) ; Špinka, Jiří (advisor)
The aim of the project is to chart the course of logistics and information flows of the selected company, to eveluate the entire process and to find improvements. In the first part there is mentioned an introduction into methods of lean manufacturing, value stream mapping and throughput time calculations. In the next section the flow of values is mapped and the map of current state is created. Futhermore, the throughput time of selected parts is computed and the mounting diagram of measured products is assembled. On to these materials are founded the sources of wasting and solutions are suggested. Afterwards on the basis of the obtained data are given solutions eveulated in terms of economic indicators.
Part Production Process Videoanalysis
Svobodová, Veronika ; Hromková, Ivana (referee) ; Knoflíček, Radek (advisor)
The bachelor thesis is describing mainly elimination of wasting time and with that also financial means on a welding line of high pressure tanks Common Rail in the company Bosh Diesel s. r. o. With detailed way is described procedure analysis of contemporary status and subsequent analysis, which is enable to search possibilities and potentials to increase productivity of work on productive line. With an application of tools ViCTA, we successfully found the searching potential in lost time in welding industrial robot’s line. Then was suggested the optimal solution, which comply the conditions of achieving minimal costs for current unlimited way of production technology on the welding line.

Interested in being notified about new results for this query?
Subscribe to the RSS feed.